High St Birmingham - As close as it gets

Case History

Sainsbury

This project was bought to us following the previous contractor being removed from site after painfully slow progress.

The project comprised of six floors which needed circa 200 tonnes of large steels (610 x 229) to be inserted into an existing building and raised to the underside of the 4.5m high floor. With a very low ground bearing pressure, the previous contractor had opted to back prop the whole building with accrows at 1m square centres through out !!! Other trades were unable to function.

We immediately looked to get rid of the propping by splicing the steel into small handle able pieces, and freed the job up. We also utilised some special liquid epoxy sacrificial jacks which were pumped up under hydraulic force to stabilise the building and ensure the heavy load was transmitted with out fear of cracking the weak concrete.

See appended letter from our client.

pdfDownload reference

This web site is designed, managed and published by Reverie Design - web design in tamworth
Copyright © 2009 Archer Structures